top of page

2014 Trip – Day 2

  • Jun 30, 2014
  • 1 min read

Book shelves now installed in Library at Mpemba School.  Door and windows still need to be done as well as painting rafters, walls etc

 
 
 

Comments

Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.
bottom of page